When was Alloa built?

When was Alloa built?

Alloa Tower, built about 1223, was in 1360 bestowed by David II. on Sir Robert Erskine, Great Chamberlain of Scotland, whose seventh descendant, John, sixth Lord Erskine, was in 1565 created Earl of Mar-a title which, forfeited in 1716, was restored in 1824, and with which that of Earl of Kellie (cre.

Does Alloa have a train station?

After a grand reopening in 2008, Alloa Railway Station connects the town of Alloa in Clackmannanshire with regular hourly service to Glasgow, Edinburgh, and Stirling. As Alloa is the terminus on Abellio’s Croy Line, trains from Alloa to all locations depart from one platform.

When did Alloa train station reopen?

15 May 2008
Reopening. The line was formally reopened on Thursday 15 May 2008. A train headed by Gresley K4 No. 61994 The Great Marquess, made four round trips from Alloa to Stirling, the first for VIPs, and the next three for paying passengers.

Why is Alloa called Alloa?

The name of Alloa is possibly derived from the Scottish Gaelic word, ail-mhagh, which means ‘rocky plain’. Traditionally a post, market and sea-port town, Alloa’s population in the census of 1831 was 4,417, increasing to 6,676 in 1851, with 618 houses counted.

What is Alloa known for?

Alloa’s most famous landmark is the 15th century Alloa Tower (National Trust for Scotland), the surviving part of the ancestral medieval residence of the Erskine family, the Earls of Mar.

What is Clackmannanshire famous for?

Clackmannanshire became known for the weaving mills powered by the Hillfoots burns. Other industries included brewing, glass manufacture, mining and ship building. Now capitalising on its central position and transport links, Clackmannanshire attracts service industries and tourism.

When did Alloa railway station open in Scotland?

Methodology may vary year on year. Alloa railway station is a railway station in the town of Alloa, Clackmannanshire, Scotland, which was re-opened on Monday, 19 May 2008. The original Alloa station was opened by the Stirling and Dunfermline Railway on 28 August 1850 when the line was opened.

When was the Alloa Kincardine railway line built?

Construction of the railway line began in September 2005. It was completed and commissioned in March 2008 for both passenger and freight services. It is currently being operated by the state owned Network Rail. Re-opening of the route has resulted in Alloa Station now being connected to the national rail network for the first time since 1968.

What is the speed of the train from Alloa to Stirling?

The passenger and freight trains travel at a top speed of 112km/h and 100km/h respectively between Alloa and Stirling stations. The speed is reduced to 48km/h between Alloa Station and Longannet Power Station.

What was the first train from Alloa to bridge line?

The first train which left Alloa N.B. station for the new bridge line was a Caledonian one, consisting of three new carriages having all the latest improvements and fitted with gas tanks, so that the gas light will be supplied in place of the old oil lamps.