Will Metro come to indirapuram?
The five metro stations are planned at Vaibhav Section, Indirapuram, Shakti Khand, Vasundhara Sector 7 and Sahibabad. The new route would offer respite to commuters from peak traffic encountered at NH-24 and the Vasundhara-Indirapuram Road.
Which metro line is under construction in Delhi?
Silver Line
The Silver Line (Line 10) is an under construction line of Delhi Metro which is scheduled to be completed by 2025. This 23.622 km line consists of 15 stations (4 Elevated & 11 Underground) from Tughlakabad to Delhi Aerocity. This Line is a part of Phase 4 of Delhi Metro.
Is there any Metro from Delhi to Ghaziabad?
It consists of the first stretch of the Delhi Metro that was constructed and commissioned in Delhi. It is an entirely elevated line and has 29 stations that runs from Rithala to Shaheed Sthal (Ghaziabad ISBT) with a total distance of 34.69 km.
Is Delhi Metro Phase 3 Complete?
As of March 2020, Phase III is in the finishing stage and scheduled to be mostly complete by the end of the year. Construction on Phase IV was formally started on 30 December 2019.
How many metro station are there in Ghaziabad?
10 metro stations
Ghaziabad: All 10 metro stations under the two metro networks in Ghaziabad will open for passenger operations from September 9 and 10.
Which metro goes to kaushambi?
Blue Line
Kaushambi is an elevated metro station located on the branch line of the Blue Line of the Delhi Metro in Delhi.
Is pink line working in Delhi Metro?
The 57-km Pink Line will be DMRC’s second driverless metro. The first driverless service was inaugurated in Magenta Line by PM Modi in December last year. The DMRC officials then had said the Pink Line, spanning Majlis Park to Shiv Vihar, would also have driverless operations by mid-2021.
Is New Bus Adda metro started?
Shaheed Sthal metro station
Shaheed Sthal (New Bus Adda) | |
---|---|
Platform levels | 2 |
Disabled access | Yes |
History | |
Opened | March 8, 2019 |