When was the 202 freeway built?
1990
Arizona 202/Constructed
Where is the new freeway in Phoenix?
The freeway is planned to connect from Interstate 17 and run west to State Route 85 in Buckeye, totaling about 29 miles. The land Phoenix owns, which is currently vacant, had been leased for sand and gravel operations from 2006 to February 2021.
What district is Ahwatukee in?
Arizona’s 9th congressional district | |
---|---|
Population (2019) | 818,850 |
Median household income | $65,379 |
Ethnicity | 56.8% White 27.2% Hispanic 5.4% Black 4.8% Asian 3.0% other 2.8% Two or more races |
Cook PVI | D+9 |
When was the 101 freeway built in Arizona?
2001
It connects several suburbs of Phoenix, including Tolleson, Glendale, Peoria, Scottsdale, Mesa, Tempe, and Chandler. Construction began in the late-1980s and was completed in 2001.
Is the 303 in Phoenix Open?
Good news for West Valley drivers: all four new ramps connecting Interstate 10 and the Loop 303 in Goodyear are now open. The Arizona Department of Transportation has now opened all four of the new ramps that allow drivers to make direct connections between I-10 and Loop 303.
When did the 202 Open in Phoenix?
This section contains a table that is missing mileposts for one or more junctions.
Location | Notes |
---|---|
Phoenix | Opened on December 22, 2019 |
Double roundabout interchange | |
Bridge over the Salt River | |
Diamond interchange with 59th Avenue frontage roads |
How long did it take to build the 202?
The $1.7 billion project took more than three years to construct 22 miles of freeway linking an interchange near 59th Avenue and Interstate 10 in west Phoenix with the continuation of Loop 202 at I-10 near the Phoenix-Chandler border.