Is Vestas closing in Colorado?
Wind power manufacturer closing Colorado plant, laying off hundreds in consolidation. Vestas is ending its wind turbine blades manufacturing in Brighton and will lay off hundreds of workers in the state as it shifts to lower production and more wind farm servicing.
Where are Vestas Blades made?
Colorado
Vestas has two North American manufacturing facilities in Colorado specializing in blades and nacelles. Vestas employs about 1,500 people in Colorado and more than 7,000 in the United States and Canada.
How much is a windmill blade worth?
For a 1.5-MW turbine, typical blades should measure 110 ft to 124 ft (34m to 38m) in length, weigh 11,500 lb/5,216 kg and cost roughly $100,000 to $125,000 each. Rated at 3.0 MW, a turbine’s blades are about 155 ft/47m in length, weigh about 27,000 lb/12,474 kg and are valued at roughly $250,000 to $300,000 each.
Who owns the wind turbines in Colorado?
NextEra Energy Resources
The Limon Wind Energy Center is a 600.6 megawatt (MW) wind farm in eastern Colorado near the town of Limon. It became the largest wind facility in the state when construction completed in 2014….
Limon Wind Energy Center | |
---|---|
Owner(s) | NextEra Energy Resources |
Operator(s) | NextEra Energy Resources |
Wind farm | |
Type | Onshore |
Why is Vestas laying off?
Company cites lower market demand as reason for reductions Employees work on vortex generators at Vestas Blades in Windsor. February 17, 2021 at 8:03 p.m. Vestas Blades America is consolidating its Colorado operations and cutting a total of 450 positions across its factories in the state due to lower market demand.
How many Vestas plants are in Colorado?
four Colorado facilities
Across the four Colorado facilities, there are approximately 4,000 employees at work in various roles from engineering and welding to inspection supervisors and data & systems specialists.
Where is the largest wind turbine farm in the US?
Roscoe wind farm (RWF) is the largest onshore wind farm in the world. It is located 45 miles south-west of Abilene in Texas, US. Owned by RWE, it is one of the biggest wind farms in the world.
What part of Colorado has the highest wind energy potential?
Cedar Creek II was built in 2011 and has 250 MW of generation capacity from 60 Nordex and 63 GE wind turbines. In 2014, the Limon Wind Energy Center became the state’s largest wind facility at just over 600 MW capacity.