Is the Hurstbridge line running?

Is the Hurstbridge line running?

86 spaces in the Montmorency Station car park will close from Monday 1 March 2021 to late 2022.

How old is hurstbridge?

First settled in 1842 Hurstbridge was originally known as Allwood, after the homestead built there, but was renamed in 1924 after Henry Hurst, who built the first log bridge across the Diamond Creek. Known as Hurst’s Bridge until 1915, it became Hurst Bridge until about 1954, when it was simplified to one word.

Are buses replacing trains on Hurstbridge line?

Buses replace trains on the Hurstbridge line between Macleod and Hurstbridge from 8.10pm Monday 30 August to 3.10am Saturday 4 September. Please visit the PTV website or call 1800 800 007 for more information and to plan your journey.

What are the stations on the Hurstbridge line?

Direction: City Center (28 stops)

  • Hurstbridge. 799 Heidelberg-kinglake Road, Wattle Glen View full timetable.
  • Wattle Glen. 549-557 Heidelberg-kinglake Road, Wattle Glen View full timetable.
  • Diamond Creek. View full timetable.
  • Eltham. 16 Panther Place, Eltham View full timetable.
  • Montmorency.
  • Greensborough.
  • Watsonia.
  • Macleod.

What train line is Watsonia on?

Hurstbridge line
Watsonia railway station is located on the Hurstbridge line, in Victoria, Australia.

What platform is Hurstbridge line at Southern Cross?

Platform 9
Platform 9 serves Epping line and Hurstbridge line. Trains for Lilydale / Belgrave line, Glen Waverley line, and Alamein line start from Platform 10.

How many people live in hurstbridge?

3,450 people
People — demographics & education In the 2016 Census, there were 3,450 people in Hurstbridge (State Suburbs). Of these 49.2% were male and 50.8% were female. Aboriginal and/or Torres Strait Islander people made up 0.6% of the population. The median age of people in Hurstbridge (State Suburbs) was 40 years.

What Shire is hurstbridge in?

Nillumbik
Nillumbik is renowned as the Green Wedge Shire, located 25 kms north-east of Melbourne. Key centres include Eltham and Diamond Creek, as well as rural townships including Hurstbridge and St Andrews.

What line is Clifton Hill on?

Clifton Hill railway station

Clifton Hill
Line(s) Mernda Hurstbridge
Distance 6.60 kilometres from Southern Cross
Platforms 2 side
Tracks 2

Which train line is Eltham on?

Bexleyheath Line
Trains to Eltham travel along the Bexleyheath Line between Dartford and the London stations of Charing Cross, Cannon Street and Victoria. Although trains have been travelling this route since 1895, the current Eltham station was opened in 1985 alongside the new bus station that had been built above the A2.

What platform is the Southern Cross on?

Platform 1
Departures from Melbourne (Southern Cross) Station, Platform 1 (Victoria) | AnyTrip NSW.

What train line is darebin on?

Darebin railway station is located on the Hurstbridge line, in Victoria, Australia. It serves the north-eastern Melbourne suburb of Ivanhoe, and opened on 8 May 1922.

Where does the Hurstbridge railway line start and end?

] The Hurstbridge railway line is a commuter rail passenger train service in Melbourne, Australia. It shares tracks with the Mernda railway line until Clifton Hill, then heads in a north-east direction through the cities of Yarra, Darebin and Banyule, and the Shire of Nillumbik.

Why is the duplication of the Hurstbridge line needed?

Planning for the Hurstbridge Line Duplication is now underway. The upgrade will deliver further improvements on the Hurstbridge line, including more train services, less crowding on peak trains and better connections to public transport in Melbourne’s north east. The project will involve:

When was the Hurstbridge and Mont Park branch built?

In June the following year the line was extended to Eltham, and ten years later (June 1912) to Hurst’s Bridge (now Hurstbridge). In 1912 the short Mont Park branch was built branching from Macleod station to serve the Mont Park Asylum . In the same year as the line reached Hurstbridge, the line between Westgarth and Alphington was duplicated .

When is the second stage of the Hurstbridge upgrade?

The first stage of the Hurstbridge line upgrade was completed in 2018 and included a new Rosanna station, duplicated track between Heidelberg and Rosanna and the removal of the Alphington and Rosanna level crossings. Major construction on the second stage of the project will begin before the end of the year.

Posted In Q&A