How long does Sikkens SRD need to dry before rain?

How long does Sikkens SRD need to dry before rain?

Drying Time: Touch-dry six (6) – eight (8) hours; dry to walk on after 24 hours minimum at 68º F and 65% relative humidity. Note: During application, moisture content of wood substrate should not exceed 21%. Do not apply when rain, dew, or frost are forecast within five (5) hours of application.

How do you use sikkens cetol?

Apply only one coat of Cetol SRD by natural bristle brush, roller or spray. If spray or roller applied, Cetol SRD must be back brushed immediately to ensure penetration and to avoid an uneven finish. When using Cetol SRDRE , brushing is the preferred method for application on decks and other horizontal surfaces.

How long does sikkens take to dry?

Features and Highlights

Brand Sikkens
No. of coats 1-3
Coverage Up to 12m² per litre
Drying time 24 hrs
Size 1L, 2.5L, 5L

How do you apply SRD Proluxe?

Apply when air and surface temperature is between 50° F (10° C) – 90° F (32° C). Do not apply in direct sunlight, if rain, snow, heavy dew or low temperatures below 40° F (4° C) are expected within 48 hours. Application using a natural bristle brush is the preferred method.

How long does cetol SRD take to dry?

approximately 6 hours
Sikkens Proluxe Cetol SRD Dry Time Drying Time – 24 hours minimum at 68°F and 65% relative humidity. At temperatures below 50º F (10º C) or conditions of high humidity the drying time will be extended. Proluxe Cetol SRD dries to touch in approximately 6 hours. Wait 24 – 48 hours for light foot traffic.

What is the difference between cetol 1 and cetol 23?

Cetol 1 is a premium, translucent exterior wood basecoat to be used with Cetol 23 Plus. Its superior oil alkyd formulation offers excellent penetration and adhesion to vertical wood surfaces. Cetol 23 Plus is a premium, translucent topcoat for Cetol 1.

Do you need to sand between coats of Sikkens?

Do not sand between coats. Always apply coatings along the grain and never across.

How long does Sikkens SRD last?

If Cetol is kept under these conditions, one can expect a typical shelf life of three years. A simple trick to help maintain the Cetol product is to prevent it from oxidizing by reducing the amount of air in the can, the same as you would for any other air dry product.

How do you apply sikkens?

Apply liberally to entire area, working the solution into and around the fastener inset areas where iron stains exist. Work into the wood-grain with a stiff bristle brush in a scrubbing motion to accelerate the brightening and cleaning process. Allow the oxalic acid solution to sit on the surface 15-20 minutes.

How many coats does cetol 23 have?

three coats
All systems consist of three coats. All three coats must be applied within 30 days after preparation. Spraying is only recommended for Cetol 23 Plus. Previous coatings must be removed prior to application of Cetol 1 and Cetol 23 Plus System.

What can cetol SRD be used for outside?

Cetol Srd is an easy to use oil based effective coating for all outdoor wooden surfaces. It uses finely ground iron oxide pigments creating a rich, natural color and offers a unique protective layer against rain, snow and UV rays. Recommended Uses: Cetol SRD is for application to areas normally troublesome to coat with film-forming products.

When to apply cetol SRD semi transparent stain?

Refer to caulk/filler manufacturer for proper application. Cetol SRD Semi-Transparent Stain should be applied within one (1) week of preparation for horizontal surfaces (decks), and within four (4) weeks for vertical surfaces (siding).

How long does it take to apply proluxe cetol SRD?

Proluxe Cetol SRD Wood Finish should be applied within one week of preparation for horizontal surfaces (decks) and four weeks for vertical surfaces (siding), provided that the surface remains free of dirt, grease, grim and mildew. • Sikkens Proluxe Cetol SRD is not manufactured with lead or mercury containing materials.

How long does it take for cetol SRD to dry?

Brush out any runs immediately to avoid lapmarks and drips. For best results,shakes and shingles should be individually dipped. To do so,immerse them in Cetol SRD,let the excess drip off or brush out,then lay out to dry for a minimum of 16 hours. Once dry, shakes/shingles can be installed.

Posted In Q&A