How do you write a rigging plan?

How do you write a rigging plan?

Rigging Plan Execution

  1. Verify all equipment, fixtures, and accessories before starting.
  2. Verify that all equipment has been properly inspected and that such inspections are valid.
  3. Identify a load manager or a rigging leader.
  4. Conduct a pre-use inspection and verify that all components are in good condition.

What does rigging plan mean?

A Rigging Plan is a plan document for the heavy and tall equipment erection procedures and methods that is to have control and establish safety precautions before the process is completed. The Rigging Plan identifies all hazard situations that might be found during the lifting process. (

What is a pick plan?

Rigging: Pick Plans. A “pick plan” refers to the method in which the crane operator measures the gross weight of a load, appropriate location on the load to attach the lifting straps or cables, and ensures that the “lift” or “pick” is performed safely and without damage.

What is free rigging on a forklift?

Free rigging is the direct attachment to or placement of rigging equipment (slings, shackles, rings, etc.) onto the tines of a powered industrial truck for a below-the-tines lift. This type of lift does not use an approved lifting attachment.

What is a Class 1 rigging plan?

Rigging plan. (1) A rigging plan is intended to ensure that the proper procedures, equipment and rigging is used for each operation and to ensure that the supporting structure can support the rigging loads. (c) Supporting structure; (d) Construction sequence and duration; (e) Required load testing and field monitoring.

What is the first step in proper rigging?

Ensuring the proper attachment to the structure of the rigging equipment is the critical first step. Placing the load hook over the center of gravity is an essential step. Placing the sling(s) so as to capture the center of gravity properly will enable the proper handling of the load.

What is a crane plan?

A Crane Lift Plan is required for every crane lift on a Dimeo project – see OSHA Subpart CC for definition of crane. The Crane Lift Plan may be valid for more than one day, as long as the configuration, location, and parameters used for developing “worst case” condition have not changed.

What is a load chart?

Definition of load chart : a schematic and graphic device to indicate the amount of authorized work yet to be performed by a machine, a group, or any other producing unit in a factory.

Can you rig from forklift?

Free rigging is the practice of attaching ropes, chains or slings to forklift tines for the purpose of below tine lifting and moving. It’s an all-to-frequent practice and not only is it usually illegal, it’s a very bad idea. Many forklift owners aren’t even aware that their free rigging is probably illegal.

What is class2 rigging?

Class II Rigging Plans. “Minimum” Required Class For The Following: • Gross lift loads for lift systems attached to the structure shall not. exceed 500 lbs. ( excludes cranes or other lifting systems not.

How does a gin pole work?

A gin pole is a supported pole that uses a pulley or block and tackle on its upper end to lift loads. The lower end is braced or set in a shallow hole and positioned so the upper end lies above the object to be lifted. The pole (also known as a mast, boom, or spar) is secured with three or more guy-wires.