Who built Hitachi trains?
Construction started in 2013 at a cost of £82 million, with train assembly commencing in 2015. It was the first factory that Hitachi built in Europe, as a result of it winning the Intercity Express Programme tender….Hitachi Newton Aycliffe.
Newton Aycliffe Rail Vehicle Assembly Facility exterior | |
---|---|
Location in County Durham | |
Owner(s) | Hitachi |
Where are Hitachi trains made?
Newton Aycliffe
The Hitachi 800 Azuma trains are assembled at the company’s Newton Aycliffe plant in County Durham. The 43,000 square metre plant was built specifically to allow the assembly of the new trains after a consortium led by Hitachi Rail Europe won the £5.7 billion contract to replace the old intercity stock.
Does Hitachi make trains?
Hitachi’s railway business includes manufacturing rolling stock, providing various systems for the management of railway operations and electrical power as well as information services. In 2005, Hitachi was awarded a contract for manufacturing a fleet of 29 Class 395 trains, including a total of 174 train cars.
What is the top speed of the Class 395?
140 mph
The Class 395 can operate at a maximum speed of 140 mph (225 km/h) under 25 kV AC overhead electrification on High Speed 1, and 100 mph (160 km/h) on 750 V DC third rail supply on conventional lines.
Is Hitachi a Japanese company?
Hitachi, Ltd., highly diversified Japanese manufacturing corporation that comprises more than 1,000 subsidiaries, including 335 overseas corporations. Headquarters are in Tokyo.
What is wrong with the Hitachi trains?
Railway Network News reports that the cracks appeared on the bogies’ lifting points – blocks of aluminium – which are used in depots when trains need to be lifted off the ground. They do not play a part in the normal operation of the train and therefore there has been no risk to passenger safety.
Are Azuma trains Hitachi?
The British Rail Class 800 Intercity Express Train or Azuma is a type of bi-mode multiple unit train built by Hitachi for Great Western Railway and London North Eastern Railway. Based on the Hitachi A-train design, the trains were built by Hitachi between 2014 and 2018.
How fast do Hitachi trains go?
125mph
Hitachi has a long history of producing top quality, high-speed trains, starting with Japan’s Bullet Train in 1964. The new trains reach speeds of 125mph in around 4 minutes 40 seconds, compared to the current time of about 5 minutes 40 seconds (for the electric-powered trains).
When did the Hitachi Class 395 come to the UK?
The type, which was entirely manufactured in Japan, is the first Hitachi-built rail vehicle to be sold to a European customer, as well as being the first British order for a Japanese train. The fleet was ordered during June 2005 by the ROSCO HSBC Rail, and was delivered to the UK between August 2007 and August 2009.
What kind of train is British Rail Class 395?
The British Rail Class 395 Javelin is a dual-voltage electric multiple unit (EMU) built by Hitachi as part of the Hitachi A-train AT300 family for high-speed commuter services on High Speed 1 and elsewhere on the Integrated Kent Franchise. The whole fleet is operated by Southeastern.
When did Hitachi start making high speed trains?
In October 2004, Hitachi was announced as the preferred bidder to supply high-speed trains for the CTRL services. During June 2005, a contract valued at £250 million was signed with Hitachi Europe Ltd to supply 28 trainsets, with HSBC Rail acting as the financier ( ROSCO ); at this point, the new fleet had an expected service date of 2009.
What’s the difference between a Hitachi train and a Ford Train?
Ford thinks they are incomparable. The Hitachi is a “modern electric train” whereas the 125 was “something really special”, a symbol of British design excellence. “When it came in in 1976 it was the second fastest in the world after Japan’s bullet train. It was something to be proud of.” A sleek, pacy, high-speed train, the InterCity 125.