What is scheduling margin key in SAP PP?
The scheduling margin key is assigned to the material ( MRP area in the material master) and is transferred when the production order is created. These values can be changed in the production order. When is an order scheduled? When you create a production order it is always automatically scheduled.
How do I assign a schedule margin key in SAP?
Go to path SPRO > Materials Management > Consumption-Based Planning > Planning > Define Floats (Scheduling Margin Key) and add it for your Plant. Also you can maintain under transaction OPPQ for you Plant under “Floats” button.
What is the purpose of the scheduling margin key?
It is used to compensate for unexpected disturbances in the production process, so that they do not delay the scheduled finish date. The floats before and after production are defined for each material using a scheduling margin key.
What is opening period in Schedule margin key?
The opening period for the planned order represents the number of workdays that are subtracted from the order start date in order to determine the order opening date. This period serves as a time float, which is available for the MRP controller when converting a planned order into a purchase requisition.
What is scheduling in SAP PP?
SAP PP scheduling is used to calculate start date/start time and end date/end time for a production order or operation. Here you will learn about scheduling production operations in SAP ERP. There are two methods of scheduling in SAP and especially in production planning.
What is SAP SMK?
SMK is used to maintain floats in days, which works as a buffer and is. referred in the Scheduling calculations.
What is MRP group in SAP PP?
A materials requirement planning (MRP) group is an object that you can use to assign common control parameters to a group of materials to plan and organize.
What is control key in SAP PP?
The control key is a default value which defines how an operation should be processed. It is entered in the operation overview or on the detail screen for the operation. Note. If a default value for the control key was specified in your system using the Customizing function, the system proposes this as the entry.
What is scheduling type in SAP?
Scheduling types are defined in Customizing (Customizing for Shop Floor Control by choosing Operations Scheduling Define Scheduling Type ).
What is Strategy Group in SAP PP?
Strategy Group – In SAP, Strategy Groups are assigned to Materials. A Strategy Group contains one or more Planning Strategies. Planning Strategy – In SAP, a Planning Strategy defines how independent demand will be used by the Planning Run (i.e. MPS, MRP, etc.) and other applications in SAP.
How do I set up MRP group?
MRP Groups Transaction codes.
- Define MRP Groups for each Material Type. SPRO –> MM –> Consumption based planning –> Define MRP group.
- Define Number ranges for planning run.
- Define MRP Groups for each Material Type.
How can you run MRP planning?
Running MRP for All Products
- The manufacturing Plant for which you want to calculate MRP run.
- The processing key as NETCH.
- Input 2 in Create Purchase req.
- Input 2 for schedule lines shows.
- Input 1 in MRP List and the system will create MRP list similar to stock/requirement list for later analysis of previous MRP run.