How is a cost estimate more than a list of costs?

How is a cost estimate more than a list of costs?

A cost estimate is more than a list of costs. It also includes a detailed Basis of Estimate (BOE) report that describes the assumptions, inclusions, exclusions, accuracy and other aspects that are needed to interpret the total project cost. Otherwise, it would be a meaningless number.

What are the supporting details of a cost estimate?

Supporting details, which include assumptions underlying estimates, cost data sources, and cost element sensitivity. Requested changes, which a newer, more accurate cost estimate may prompt. Updates to the cost management plan, such as those necessitated by changes to the project scope.

What is prime cost estimate for residential building?

Detailed Estimate for The Proposed New Construction of Residential Building Detailed estimating, sometimes referred to as “Prime Cost”, “Bottoms Up” or “Grass Roots” estimating requires a thorough and detailed analysis of all the tasks required to deliver a project or product.

What are the four principles of cost estimation?

4 Principles of Cost Estimation 1. Cost estimation is used to predict the quantity, cost and price of the resources required by the scope of a project. A project might be any process that is started to perform work activities and/or create assets.

What do you mean by base cost estimate?

The term “base cost estimate” was developed by WSDOT for cost risk analysis and represents the reviewed and/or validated project cost estimate to be used in the quantitative risk analysis for a project. The base cost represents the cost that can reasonably be expected if the project materializes as planned, including PE, RW, and CN costs.

What are the terms and conditions for a sample estimate?

This general terms and conditions sample is based on a Shopify template: 1. This estimate is an approximation and is not guaranteed. The estimate is based on information provided from the client regarding project requirements. Actual cost may change once all project elements are finalized or negotiated. Prior to any changes of cost, the client

When to use progressive cost per square foot?

The tool also has a progressive cost per sq. ft. formula, so you can get the most accurate cost estimate. This means that when your Total square footage is LESS than 1,500, the cost / foot gradually increases to account for additional expenses incurred by the builder, with fewer “billable” square feet.

What should be included in a cost estimating manual?

Clear accountability: • Accountability for cost estimating and cost management at all levels of the agency • Defined roles and responsibilities for every person involved • Accountability that is tracked at key milestones in the process This manual is intended as a guide for developing and managing project cost.