How do I get a building permit in Maricopa county?
View all permits or call (602) 506-3301.
Can you build your own home in Maricopa county?
Building a new home on your own land requires a building permit. In Arizona, there is no statewide code, and each municipality and county has its own permitting process.
How long is a Maricopa county building permit good for?
180 days
Note: Permit valid 180 days from issuance or last inspection. The following graphic is designed to provide a general overview of the building permit process.
How big of a shed can I build without a permit in Arizona?
The City of Phoenix has numerous zoning classifications and each one has a list of permitted uses and standards for building setbacks, densities, etc. Please refer to the City of Phoenix Zoning Ordinance for details on each zoning classification. 2.
How much is a building permit in Maricopa County?
Fee Schedule
| Stormwater Pre-Construction Phase | Fee |
|---|---|
| Pre-Construction Plan Review | $1050 |
| Pre-Construction Site Inspection | $325 |
| One Additional Review of Pre-Construction plans with minor revisions and One Inspection of the Site Revisions | $670 |
How do I get a building permit in Phoenix AZ?
Where Do I Get My Permit?
- Locate Your Local Building Department Office. Construction permits are issued at your local Building Department.
- Complete The Permit Application. There are several ways to obtain a Building Permit Submittal Form.
- Provide the proper Construction Documents.
- Pay the Fees.
- Receive Your Permit.
Does Arizona require building permits?
In general, a building permit is required when any structural change or major alteration is made to a building or when any new construction is undertaken. When applicable, separate permits for mechanical, plumbing and electrical work are required. Your proposed project must comply with the zoning code.
Do I need a permit to pour a concrete slab in Maricopa County?
Building permits are required for all structures with the exception of a structure that is less than 200 square feet with no electrical, plumbing or mechanical.
Do I need a permit to build a shed in Maricopa County?
How much is a building permit in Phoenix AZ?
196 New Construction, Additions and Remodel Existing Building Permits. Search within This
| Project Valuation | Permit Fee |
|---|---|
| $1.00—$1,000.00 | $150.00 Base fee only* |
| $1,001.00—$10,000.00 | $150.00 on first $1,000.00, plus $9.00 for each additional $1,000.00, or fraction thereof, to and including $10,000.00 |
How do I get a building permit in Arizona?
Do you need a permit in Maricopa County AZ?
The Maricopa County Department of Transportation (MCDOT) requires permits for all work within its right-of-way. This page will provide you step-by-step information on how to obtain a permit to work within MCDOT right-of-way.
Where do I apply for a building permit in AZ?
You must also apply for an installation permit at the Arizona Department of Housing Manufactured Housing Division. Other permits, such as the Floodplain Use Permit, may be required prior to receiving the installation permit. What Is the Status of My Permit?
What is a performance bond in Maricopa County AZ?
A performance bond is required to provide financial assurance to Maricopa County that the proposed work will be performed and completed in accordance with the permit and Count standards and before the permit expires. It also ensures the work site is restored to the condition stipulated on the permit and/or approved plans.
Where do you get a floodplain permit in AZ?
Floodplain Use Permits are issued by the Flood Control District of Maricopa County for development in a floodplain, including extraction of sand and gravel or other material.