What is the last services on the M5?
The last services available on the M5, Exeter services are run by moto-way and offer a Travelodge for overnight accommodation and ecotricity to charge your car.
Does Strensham Services have Mcdonalds?
Strensham is one of Roadchef’s most profitable service areas, and is a popular place to trial new ideas. McDonald’s, Hot Food Co, Soho Coffee, Boots and Leon all trialled their first Roadchef branch here.
Does Sedgemoor services have fuel?
Shell Sedgemoor South is a petrol station located in the Axbridge area with a variety of unleaded and diesel products including Shell V-Power Unleaded and Shell V-Power Diesel.
What county is sedgemoor in?
Somerset
Sedgemoor
Sedgemoor Sedgemoor District | |
---|---|
Ceremonial county | Somerset |
Admin HQ | Bridgwater |
Created | 1 April 1974 |
Government |
What Junction on M5 is Gloucester services?
Our Westmorland Family Story This opens in a new window.
Are there any services off the M5 motorway?
Service areas off the M5 Motorway M5 Services There are 11 northbound motorway services along the M5 motorway from Frankley Services between junctions 3 and 4 to Exeter Services at junctions 30.
When did the M5 motorway start in Worcestershire?
The first 26 miles (42 km) of the M5 motorway was constructed as a dual two-lane motorway with Worcestershire County Council acting as engineer. This section – from junction 4 ( Lydiate Ash) in the north to a trumpet junction with the M50 in the south – opened in July 1962.
Where are the Gloucester service stations on the M5?
Gloucester Services is a pair of 24hr Motorway Service Areas serving the northbound and southbound carriageways of the M5 between Junction 11A and Junction 12, near Whaddon, Gloucester. It specialises in selling artisanal food, and does not offer outlets for popular chain food brands.
When was the northern section of the M5 built?
North of Junction 4 the M5 was constructed in sections, from 1967 to 1970, together with the Frankley services. Much of the northern section beyond Junction 3, from about Quinton to the junction with the M6 motorway, was constructed as an elevated dual 3-lane motorway using concrete pillars.