How long was the Big Dig?

How long was the Big Dig?

The Central Artery/Tunnel Project (CA/T), commonly known as the Big Dig, was a megaproject in Boston that rerouted the Central Artery of Interstate 93 (I-93), the chief highway through the heart of the city, into the 1.5-mile (2.4 km) tunnel named the Thomas P. O’Neill Jr.

Can you fast travel in ac3?

To use Fast Travel just load the map with the select button and scroll over to any point you can fast travel to near the main mission icon. Click on that spot and you will immediately be at a loading screen for a brief moment. After the loading you will be at that location saving you a lot of time.

Is Boston Big Dig finished?

Planning began in 1982; the construction work was carried out between 1991 and 2006; and the project concluded on December 31, 2007, when the partnership between the program manager and the Massachusetts Turnpike Authority ended….Big Dig.

Overview
Work begun 1982
Constructed 1991–2007
Opened 2003
Traffic Automotive

Where are the fast travel points in Boston underground?

Boston Underground. 1 GREEN DRAGON TAVERN. This fast travel point is already unlocked once you reach Boston. It’s also used in the Sam Adams mission “Lying Low” in Sequence 2 NORTH PORT. 3 Old North Church. 4 Beacon Hill. 5 Crown Coffee House.

How does fast travel work in Assassin’s Creed 3?

The chapter below of our Assassin’s Creed III Remastered guide contains everything you need to know about fast travel mechanic. Fast travel was already available in the previous installments, but AC III lets you use it directly from the map. If you have discovered a given area, just click on it and Connor will automatically move there.

Where to find Boston gate in Assassin’s Creed 3?

Place the lantern down and approach the V-shaped tunnel to see a red dynamite keg. Bust out the Pistol and shoot it to reveal a new path. Enter through the newly opened area to find the doorway to Boston Gate. The doorway has a projector puzzle, so use the screencap above to solve the puzzle…