Does drywall have to end on stud?
Yes, you need to start and stop drywall on a stud. Every edge of the sheetrock needs to be supported continuously. Cut the sheetrock down so it’s edge is in the middle of a stud. Try to put your cut edge in a corner because the factory edges are tapered so when you tape and mud it ends up flat.
What side do you cut drywall?
How to Make Simple Knife Cuts to Drywall. In most cases, drywall is cut by scoring through the paper on the finish side (the one with white paper) using a sharp drywall knife. As soon as you notice the blade dulling, turn it around or replace it.
Do you stagger sheetrock on ceiling?
It’s not necessary to stagger seams on ceiling drywall. However, because these joints are relatively difficult to finish—and tend to be noticeable in the finished product—it’s a good idea to stagger the drywall panels to make the joints less visible.
Should drywall be staggered?
Why is drywall hung horizontally?
Hanging horizontally also allows the drywall to flow over the framing so that bowed studs create less of a problem. If the drywall were hung vertically and a seam placed on a bowed out stud, the seam would be magnified because of the bump in the wall.
Can you hang drywall vertically?
Commercial: Hang the drywall vertically . On commercial jobs, fire codes often require seams to fall on the entire length of the framing, so the drywall must be hung vertically . Jul 2 2019
What size sheetrock for ceiling?
Sheetrock used to construct a ceiling should be at least 1/2” thick (2.54 cm) to prevent the boards from sagging, and the sheets should be arranged to minimize the number of joints in order to create a smooth appearance. Once the ceiling is complete, some owners may decide to add a textured finish.
How do I Hang sheetrock?
Hanging the Sheetrock Measure out your sheetrock before hanging. Consider gluing each stud and joist before it receives the drywall. Hang the toughest part first — the ceiling. Mark the stud centers on the ceiling drywall. Cut the drywall using a utility knife and a t-square. Start on the walls once the ceiling is completed.