What are the parts of the Building Regulations?
Building regulations
- 2.1 Part A: Structure.
- 2.2 Part B: Fire safety.
- 2.3 Part C: Site preparation and resistance to contaminants and moisture.
- 2.4 Part D: Toxic substances.
- 2.5 Part E: Resistance to the passage of sound.
- 2.6 Part F: Ventilation.
- 2.7 Part G: Sanitation, hot water safety and water efficiency.
How many parts are in the Building Regulations?
The ‘requirements’ in the Building Regulations. The ‘requirements’ with which building work must comply are contained in a schedule (Schedule 1) to the Building Regulations and are grouped under 15 ‘parts’.
What is Part B of the Building Regulations?
Part B contains guidance on fire safety, including means of escape, fire spread, structural fire protection and fire service access.
What is Building Regulations Part P?
Part P states that anyone carrying out electrical installation work in a home must make sure that the work is designed and installed to protect people from fire and electric shocks. Part P applies to any changes made to existing installations, including any parts that have been rewired.
When did approved b start?
It takes effect on 30 August 2019 for use in England. Approved Document B has been redrafted to clarify its language and content in line with the Department’s style guide for approved documents. This edition of the approved document replaces the 2006 edition including all amendments.
Can I use my loft as a bedroom?
But when it comes to being a bedroom, a converted loft room cannot be called a bedroom merely because it offers enough space to fit a bed in, or because one has been put in there: a loft needs to be converted for the purposes of being a sleeping area, and in accordance with building regulations, in order to be called a …
What is allowed under Part P?
Part P applies to electrical installations that operate at voltages not exceeding 1000 V a.c. Notifiable work includes new installations, house re-wires, and the installation of new circuits. Notifiable work also includes additions to existing circuits in special locations.