What time does KL MRT close?
The train line starts operating at 06:00 every day, but closing time varies depending on the station. Generally, Kuala Lumpur MRT stations are closed at midnight from Monday to Friday, and 23:00 during weekends.
What time is the last LRT?
First / Last Train Timings
North South Line – (NS4) Choa Chu Kang | ||
---|---|---|
Destination | First Train | Last Train |
NS16 Ang Mo Kio | – | 12:27am |
NS1 Jurong East | 5:39am | 12:53am |
Bukit Panjang LRT – (BP1) Choa Chu Kang |
What time is the first trip of MRT?
MRT 3 Schedule / Operating Hours The first trip from both North Avenue and Taft Avenue is at 5:30 AM. The last trip from the north is at 9:10 PM, while the last trip from Taft is at 10:11 PM.
Is MRT under Rapidkl?
Rapid KL (styled as rapidKL) is a public transportation system owned by Prasarana Malaysia and operated by its subsidiaries Rapid Rail and Rapid Bus….Rapid KL.
Overview | |
---|---|
Daily ridership | LRT: 437,822 (2019) MRT: 175,213 (2019) Monorail: 34,344 (2019) BRT: 16,444 (2019) Bus: 374,755 (2019) |
Website | myrapid.com.my |
Operation |
What time is the last MRT train Malaysia?
OPERATING HOURS
Station | |
---|---|
KL Gateway – Universiti Mon – Sat: 6:00 AM – 11:55 PM Sunday/ Public Holiday: 6:00 AM – 11:20 PM | Last train Monday – Saturday 12:15 AM |
Taman Jaya Mon – Sat: 6:00 AM – 11:55 PM Sunday/ Public Holiday: 6:00 AM – 11:15 PM | Last train Monday – Saturday 12:18 AM |
What time is the last train for downtown line?
Downtown Line – (DT17) Downtown | ||
---|---|---|
Destination | First Train | Last Train |
Weekdays & Sat | Daily | |
DT1 Bukit Panjang | 6:13am | 12:16am |
DT35 Expo | 6:04am | 12:06am |
Is Caldecott brown line open?
When fully completed, it will span 43km with 32 stations. The first two stages of the line opened in 2020 and 2021, with subsequent stages opening in 2022, 2024 and 2025….Timeline.
Date | Project | Description |
---|---|---|
2022 | Stage 3 | Caldecott – Gardens by the Bay (13 stations) |
2024 | Stage 4 | Gardens by the Bay – Bayshore (7 stations) |
When does the 4 MRT start in Putra Heights?
The 4 mrt & lrt (Putra Heights) has 29 stations departing from Sentul Timur and ending in Putra Heights. 4 mrt & lrt time schedule overview for the upcoming week: Starts operating at 5:45 AM and ends at 11:50 PM.
When does the 3 MRT start and end in Ampang?
The 3 mrt & lrt (Ampang) has 18 stations departing from Sentul Timur and ending in Ampang. 3 mrt & lrt time schedule overview for the upcoming week: Starts operating at 6:00 AM and ends at 11:00 PM. Operating days this week: everyday.
Which is the best LRT route in Kuala Lumpur?
The Most Popular Urban Mobility App in Kuala Lumpur. The first stop of the 3 mrt & lrt route is Sentul Timur and the last stop is Ampang. 3 (Ampang) is operational during everyday. Additional information: 3 has 18 stations and the total trip duration for this route is approximately 36 minutes.
Is there a MRT from KL to Kajang?
The MRT Sungai Buloh – Kajang (SBK) Line connects Sungai Buloh (northwest of KL) and Kajang (southeast of KL) through its 51 km route. It comprises of a 41.5 km elevated guideway with 24 stations and 9.5 km tunnel segment with 7 underground stations.