What are EIA terms of reference?
The terms of reference sets out the framework for the planning and decision-making process to be followed by the proponent during the preparation of an environmental assessment. In other words, it is the proponent’s work plan for what is going to be studied.
What is DOE in EIA?
For projects which have been determined by the Department of Environment (DOE) to go through the detailed environmental impact assessment (EIA) procedure, the project proponent must submit the terms of reference (TOR) in accordance to the format outlined in specific EIA guidelines.
Why are the terms of reference TOR important in conducting an EIA?
TERMS OF REFERENCE (TOR) In preparing a project-related and site-specific TOR for the Detailed EIA study, the project proponent and EIA consultant shall be able to identify key issues related to the project being proposed.
What is EIA report Malaysia?
The Environmental Impact Assessment (EIA) procedure in Malaysia has been developed primarily as an aid to the environmental planning of new or existing development projects. This paper describes the EIA process in Malaysia with a particular reference to a proposed new road which has undergone an EIA study.
How do you write a terms of reference?
STEPS IN THE COMMISSIONING PROCESS
- Decide how decisions about the evaluation will be made.
- Scope the evaluation.
- Develop the Terms of Reference (ToR)
- Engage the evaluation team.
- Manage development of the evaluation methodology.
- Manage development of the evaluation work plan including logistics.
What is DOE notification?
DOE written notification and declaration are an application to fulfill requirement in Environmental Quality (Clean Air) Regulations 2014 focusing on air pollution control system in chimney, fuel burning equipment, furnace and incinerator.
Who can conduct EIA?
B. 14. An EIA Study has to be conducted by competent individuals who are registered with the Department of Environment under the EIA Consultant Registration Scheme. The DOE will reject EIA reports which are conducted by individuals who are not registered with the Department.
Who is responsible for EIA study?
EIA is generally the responsibility of the project proponent and is often prepared with the help of external consultants or institutions, i.e., the EIA practitioners.
What is a Terms of Reference in a report?
The Terms of Reference provides the reason and/or the purpose for which the report was developed. This information helps the reader to understand the perspectives and motivations of the author(s) of the report.
What are Terms of Reference for a working group?
Terms of Reference (ToR) can set out the working arrangements for a network and can list vital information about the network, such as its purpose, chair and membership, meeting schedule, level of administrative support, and dispute resolution processes. Below is a ToR template that network organisations can use.
What are the terms of reference for EIA in Malaysia?
EIA Procedure and Requirements in Malaysia, p. 14. For detailed EIAs, the Terms of Reference (TOR) acts as the scoping process, which must be submitted by the projct proponent “in accordance to the format outlined in specific EIA guidelines.” EIA Procedures and Requirements, Appendix 5 (1).
How is a Tor prepared for an EIA report?
Hence, the submission of this TOR is prepared in accordance with the format outlined by the DOE. This TOR document presents the scope, project concept, key environmental issues and proposed methodology in preparing the EIA report. This TOR shall then be tabled to the Review Panel for deliberation and endorsement.
What should be included in an EIA study?
The legal requirements of the project and future legislation that need to be drafted. If the project site comes under special categories, and the legislation regarding the same. Recommended mitigation strategies. The expertise required for the EIA study. The expected time limit for the entire EIA study.
How does an environmental impact assessment ( EIA ) work?
All the stakeholders are invited to submit their concerns regarding the project during a public hearing organized by the EIA committee, which is followed by discussions and deliberations. The finalized list of this stage of EIA is submitted to the Ministry in the form of TOR.