What is included in a BIM Execution Plan?
The BEP should include agreed roles and responsibilities (and relevant authorities and approval processes), a strategy for key deliverables and what existing information will be used, and a guide to the key project milestones and where these fit as part of the wider programme.
Who prepares BIM Execution Plan?
Who writes the BIM Execution Plan? The BIM Execution Plan is a collaborative document to be produced by the team. There should be only one BIM Execution Plan and all parties to the project must agree its contents and commit to implementing them.
What are the critical steps to get right at the start of a BIM project?
BIM COORDINATION KICKOFF MEETING AGENDA
- Existing model availability.
- File formats to use for coordination.
- Software used by different stakeholders.
- Origin & orientation in tools.
- Frequency of coordination meetings.
- Tea / coffee / beer / tequila break depending on how well that went.
What is EIR in BIM?
The Employer’s Information Requirements (EIR) form part of the appointment and tender documents on a BIM Project to enable suppliers to produce their initial BIM Execution Plan (BEP).
How do I create a BIM project?
- Step 1 – Establish your goals. Any change requires the definition of goals, the direction you are going to pursue.
- Step 2 – Choose a pilot project.
- Step 3 – Improve processes and create procedures.
- Step 4 – Build your BIM hotel.
- Step 5 – Improve communication.
- Step 6 – Monitor workflow in the project.
What are the two types of BIM Execution Plan?
There are mainly 2 types of BIM Execution Plans. Pre-Contract BEP and Post-Contract BEP.
What is CIC BIM protocol?
The Protocol identifies building information models that are required to be produced by the project team and puts in place specific obligations, liabilities and associated limitations on the use of those models.
What are the 4 stages of BIM?
The Four Phases of BIM Implementation
- Evaluation/Assessment.
- Preparation for the Transition / Project Pre-Planning.
- Execution of the Plan / Design and Construction.
- Operations and Maintenance through Experience and Expertise.
What makes a good quality BIM model?
Model quality means conformance to requirements. Requirements include LOD, procedures, specifications, and accuracy of the building information model geometries. Conformance is the ability of a model to meet its BIM specifications.
What should an EIR contain?
The content of the EIR covers three main areas: Technical – details of software platforms, definitions of levels of detail etc. Commercial – details of BIM deliverables, timing of information exchanges and definitions of information purposes.
What exactly is a BIM execution plan?
The BIM Execution Plan (BEP), is a necessary part for the development of a BIM project in engineering. It defines and ensures the actors who will intervene in a project, from the design and construction phase to the operation.
Why do you need a BIM execution plan?
A BIM Execution Plan is an integral part of any new construction development project . It becomes more critical while working in a project where international collaboration is essential. It ensures that accurate information is accessible at every touchpoint at every moment.
What is a construction execution plan?
A project execution plan is a document which is developed at the start of a construction project which outlines the framework for a project to follow. It outlines the roles and responsibilities of the various parties and how critical components of a project will be managed.
What is a project execution plan?
A Project Execution Plan (PEP) is one of the project baseline document and the governing documents for the project operation and management that establishes in appropriate terms what will be done to meet the project scope and contractual requirements. The PEP is to describe a project specific plan in strategic…